Hampton Bridge

Sign in to edit · History · What links here · Last edited November 20, 2026
This is an older version of this page, saved November 20, 2026 by import. View the current version · Compare with current

The Hampton bridge span the Doe River just on the Northwest side of Hampton. It ran in a Northwest/Southeast direction. The bridge led directly into Tunnel #1 (from the North).

This 242’ three-span wood deck Howe truss bridge was built by Joseph H. Cofrode and Francis H. Saylor of Philadelphia, in 1881. It was covered in 1891 or 1892. This bridge was supported by two stone abutments and two stone piers. This bridge served throughout the life of the E.T. & W.N.C. Railroad’s narrow gauge operations. [1] [2]

Modeler Info

242' Deck Truss Bridge, the sides were covered ~1891

References

  1. ↑ Bill Schneck
  2. ↑ For photographs and plans of this bridge see "The Hampton Covered Deck Bridge," by John R. Waite, in The Blue Ridge Stemwinder, Winter 1992 (Volume 4, Number 3), pages 7 – 10.